Mid November = COLD!

Keep the crew in your prayers this week. They are working in some pretty tough conditions. The field that the building is rising from is like a wind tunnel for that frigid air to race through. They continue to be very gracious to this humble photographer and in good spirits.

The steel is going up over the 3K-5K area and also the entrance and two story lobby. The gym and stage have roofing over them now too. The interior walls in the 1,2,3 grades and library are taking shape and heating ducts and plumbing are going in that area too. Exterior bricks are being laid in the lower grade area too.

About two weeks ago the precast gym walls were placed. This was a wonder to watch. The panels are about 8 feet wide and 33 feet tall, made of layers of concrete, insulation, and with an attractive facing where they will be exposed. They are heavy.

Exterior wall boards are going up in the preschool area and they hope to have everything walled up in the next month or so.

 

Below are some images I’ve taken in the past few weeks, documenting the progress.

 

Bob

 

BC3A6457 LibraryWall-00001 Pouring 3rd Grade Classroom-00001 Library-00001 DCIM105GOPRO 3rdGradeRoom-A159-00001 5thGradeRoomA145-00001 BC3A5560

 

 

 

One thought on “Mid November = COLD!

  1. Denise Prom

    We are so excited to see the progress of the E&AC! Thanks for sharing the updates and photos. Our Catholic community is truly blessed!

    Reply

Leave a Reply

Your email address will not be published. Required fields are marked *